New: Autonomous AI risk intelligence is live — your compliance program in 12 minutes. Get started →

Industry Guide · Defense Contractors

CMMC 2.0 is here. Miss the gate, lose the contract.

Prime contractors and subcontractors in the DoD supply chain — from 10-person machine shops to 500-person integrators.

Overview

Every DoD contract touching CUI now flows down CMMC Level 2. Your SPRS score is public. Your prime is asking for it. Scarlet Risk turns 6 months of prep into a 6-week sprint.

Top risks in this industry

  • Low SPRS score locking you out of new awards
  • Flow-down clauses from primes with tight deadlines
  • CUI mishandled outside a scoped enclave
  • POA&M items aging past the 180-day close window

Frameworks typically required

How Scarlet Risk helps

  • Automated NIST 800-171 gap analysis

    Score against all 110 controls with evidence prompts and POA&M output.

  • SPRS-ready reporting

    Generate the exact scoring artifact primes and DoD contracting officers ask for.

  • CMMC readiness reports

    Board-Ready and Policy Gap reports mapped to DoD language, $100–$150 each.

Composite scenarios

10-person machine shop, first CUI contract

Scoped a network enclave, built a POA&M, and shipped an SPRS score inside 6 weeks. Prime accepted, contract signed.

80-person integrator, flow-down deadline

Compressed a 6-month gap-analysis into 4 weeks using Scarlet Comply. Cleared 42 of 110 open controls before the prime's re-audit.

Frequently asked

Do I need CMMC Level 2 if I don't touch classified info?

If your contracts reference DFARS 252.204-7012 or you handle CUI (Controlled Unclassified Information), yes — even without classified access.

How fast can I get a usable SPRS score?

A prepared 20-person shop can produce a self-assessment SPRS in 4–6 weeks using Scarlet Risk. Third-party assessment adds 8–12 weeks.

Can I self-attest at Level 2?

A subset of Level 2 contracts allow self-attestation. Most require a C3PAO assessment.

Ready to shortcut this?

Book a live demo tuned to defense contractors or run the ROI numbers.

Other industries